1. It adopts imported proportional combustion system and is equipped with waste heat recovery system, which avoids the repeated ignition of traditional burners and the inhalation of cold air into the furnace, which improves the utilization of heat energy and saves 20% of energy.
2. The latest frame structure of our factory, high-quality thermal insulation and sealing materials, greatly reduce the heat transfer inside and outside, and significantly improve the thermal efficiency.
3. The top rod moving mechanism is adopted in the furnace, with integrated design and precise transmission. The aluminum rods in the furnace will not be superimposed, and the entry and exit are smooth.
4. The hot shearing machine is safe and reliable, the oil cylinder does not leak oil, the failure rate is low, the operation is simple, and the surface of the cut aluminum bar is flat, smooth and small in deformation.
Place of Origin: Foshan,Guangdong, China
Condition: New
Type: Heating Furnace
Usage: Heat Treatment Furnace
Marketing Type: Ordinary Product
Warranty of core components: 1 Year
Core Components: PLC
Weight (T): 25 T
Power (kW): 30
Warranty: 1 Year
Key Selling Points: Energy Saving
Applicable Industries: Manufacturing Plant, Aluminum Profile
After-sales Service Provided: Free spare parts, Field installation, commissioning and training, Field maintenance and repair service, Video technical support, Online support
After Warranty Service: Video technical support, Online support, Spare parts, Field maintenance and repair service
Supply Ability: 100 Set/Sets per Year
Packaging Details: Common
Port: Guangzhou
Lead Time:
Quantity(sets) |
1 - 1 |
>1 |
Est. Time(days) |
30 |
To be negotiated |
No. |
Item |
Technical specification |
Remark |
1 |
Quantity of billet in chamber |
12 pcs |
|
2 |
Max capacity |
800kg/h |
|
3 |
Maximum heating temperature |
550℃ |
|
4 |
Temperature control accuracy: |
±10℃(between air temperature at the front and on the back, in a normal production cycle) |
Measured according to regular production cycle |
5 |
Initial heating time: |
<3h |
|
6 |
Shear length |
300-700mm |
Manually adusted |
7 |
Shearing accuracy: |
±3mm |
|
8 |
Maximum shearing force: |
45T |
Calculated as per 6063 alloy |
9 |
Max system pressure |
16MPa |
|
10 |
Billet conveyor power |
1.5kw |
|
11 |
Total power |
Approx 50KW |
|
12 |
Burner |
TBL85P |
Baltur,Italy |
13 |
Furnace out-shell temperature |
<room temperature+15℃ |
Except the furnace joint |